Our portfolio includes commercial, industrial, and agricultural projects - both new build schemes and major alteration/refurbishment works. Shown here are some examples of our completed projects. For more details of each project please click on the links below.
HMP, Rochester
North Kent Police
Tesco, Orpington
Eurokent, Broadstairs
Holborough Valley

North Kent Police Station, Northfleet
Gallagher have recently successfully completed the groundwork and external works packages on this £45 million scheme for Kier South East. Our overall works comprised the construction of the ground floor slab, drainage, service ducts, paving and extensive tarmac car parking areas. This was all completed within an 18 month duration on site.
Main Contractor: Kier South East
Contract value: £3 million
Completed: March 2008.
Gallagher was the first sub-contractor to complete their works on site which was a great achievement by the site team.
Tesco, Orpington
Gallagher have been working for HBG on the construction of a new 80,000sq ft Tesco store (shell only) and 73 apartments with all associated car parking, plant areas and external works. Following perimeter secant piling operations (by others), Gallagher undertook construction of the R.C perimeter capping beam to the secant piled wall. Completion of the 70,000m³ bulk earthworks is now drawing to a conclusion, as we complete excavation down to the lower level basement. Following piling to the lower level basement, Gallagher will excavate and cast a series of R.C pile caps, bases and core foundations.
Main Contractor: HBG
Contract value: £2.5 million
Completed: March 2008.
EuroKent, Broadstairs
Gallagher were appointed by McLaren to undertake earthworks, drainage, substructure, superstructure and external works to this project comprising of mixed leisure facilities - four new restaurants, multi-screen cinema, bingo facility and casino Works commenced on site in late 2006.
Main Contractor: McLaren
Contract value: £2.27 million
Completion: October 2007
Holborough Valley, Snodland - Phase 3

Gallagher are currently progressing with the infrastructure works and new roads construction on Phase 3 of this Berkeley Homes development. This phase is a continuation from previous phases that Gallagher have completed over the years.
Main Contractor: Berkeley Homes
Contract value: £7.9 million; Phase 3 - £4 million
Completed: May 2008
HMP, Rochester
Gallagher were appointed by Wates to undertake enabling, bulk earthworks (cut & fill), drainage, substructure groundwork’s and external works & landscaping to this project. Works have been undertaken at an incredible pace on four fronts concurrently, (i) upgrade & new works to existing entrance and perimeter, (ii) upgrade & new works within the existing prison establishment itself, (iii) new works to the area formerly used as the farm and finally (iv) the new works (referred to as the TCF) which is the former sports field area.
Main Contractor: Wates
Contract value: £2.4 million
Due for completion: June 2008
University of Kent, Canterbury (Darwin Fields Campus)
Construction of 452 study bedrooms in four-storey dwellings across eight blocks. Works include bulk earthworks, sheet piling, RC board pile attendance, drainage and service ducts plus all reinforced concrete works.
Main Contractor: Mansell
Contract value: £2.8 million
Due for completion: Late 2008.
If you would like more details on any of these, please contact us directly.